Send enough information for a useful first review
A drawing or CAD model is the best starting point. Add the expected quantity, operating environment, mating parts and any fixed resin requirement. For gears, racks and sprockets, include the complete geometry and the mating transmission details where available.
If you are replacing an existing component, include the current part number or sample reference and explain what must remain interchangeable.

What makes an RFQ actionable
A useful RFQ does more than identify the component name. Include the latest drawing or CAD, mating interface, material requirement or service environment, sample and production quantity, and the dimensions or tests that control acceptance.
| Send | Why it matters |
|---|---|
| 2D drawing + revision | Establishes dimensions, tolerances, datums and notes. |
| 3D model | Clarifies complete geometry and supports DFM review. |
| Mating-part data | Confirms mesh, center distance, chain interface or assembly fit. |
| Environment + duty | Supports material, wear and dimensional-stability decisions. |
| Quantity | Separates machining, prototype tooling and production-tooling routes. |
What happens after submission
The first review checks whether the geometry, material and quantity describe a manufacturable route. Open questions are returned against the drawing or assembly interface. Once the design basis is clear, the quotation can distinguish tooling, samples, production and any secondary operation instead of hiding assumptions inside a single price.
A complete first message reduces quotation risk
Attach the latest drawing or 3D model and identify the revision. Include expected batch and annual quantity, material requirement if already frozen, color or reinforcement, the mating shaft/gear/chain or surrounding assembly, service temperature and environment, and any dimensions or surfaces that are critical to function. If the project is a replacement part, state whether an original sample is available for measurement.
Do not hide unresolved items behind a nominal dimension. If backlash, fit, resin grade, gate location or inspection method is still open, mark it as a review item. That lets the engineering response separate fixed requirements from choices that can be optimized for manufacturing.
What happens after you send an RFQ
A useful first review separates confirmed inputs from open engineering decisions. The drawing revision, quantities and mating interface are checked first. Material, process and tolerance questions are then returned as specific review items instead of being filled with assumptions. When tooling is involved, DFM and sample acceptance should be agreed before production release.
For a new component
Send CAD, drawing, target quantity, material status, application environment and the surfaces or dimensions that control assembly.
For a replacement
Add photographs and an existing sample if available, but identify the actual field problem so worn geometry is not copied as the target.
For a gear, rack or sprocket
Include the mating member or chain standard, pitch geometry, shaft or mounting interface, expected duty and the required functional backlash or engagement condition.
If some inputs are unknown, mark them as open instead of estimating them. That makes the first engineering response more useful and prevents provisional assumptions from silently becoming production requirements.